top of page
Asset 54.png

Trailblazers of Troubleshooting

Your best friend during tough times. We are responsible and accountable for maintenance of equipment and machinery to keep the operations humming and achieve the required level of performance.

​

We keep things on the run. We break for none.

2.png

Meet the Maestros
RAF

Yet-to-join.png

Amit Bamal
Head - Maintenance & Engineering

Asset 43.png

Hemraj Thapa
Section Incharge -
Maintenance (Electrical)

Muslim-Khan.png

Muslim Khan
Supervisor -
Maintenance
(Mech / Fabrication)

Asset 45.png

Mohammad
Imran

Incharge -
Maintenance (Die)

Asset 47.png
Asset 48.png
Yet-to-join.png

Sagar Bhavsar
Senior Engineer

Chandrasingh
Thapa

Incharge

Anup Bhuyan
Sr. Engineer -
Automation

Dipesh-patel.png

Dipesh Patel
Engineer

Yet-to-join.png

Jeel Patel
Engineer

Yet-to-join.png

Jaikumar Bhandari
Junior Engineer

Yet-to-join.png

Tapan Kapdi
Supervisor

Yet-to-join.png

Sandip Dhoranwala
Senior Engineer

Yet-to-join.png

Divyeshbhai Dhodi
Fitter

Yet-to-join.png

Ashishkumar Bhandari
Fitter

2.png

Meet the Maestros
Uniacoustic

Yet-to-join.png

Amit Bamal
Head - Maintenance & Engineering

Asset 43.png

Hemraj Thapa
Section Incharge -
Maintenance (Electrical)

Muslim-Khan.png

Muslim Khan
Supervisor -
Maintenance
(Mech / Fabrication)

Asset 45.png

Mohammad
Imran

Incharge -
Maintenance (Die)

Asset 47.png
Asset 48.png
Yet-to-join.png

Sagar Bhavsar
Senior Engineer

Chandrasingh
Thapa

Incharge

Anup Bhuyan
Sr. Engineer -
Automation

Dipesh-patel.png

Dipesh Patel
Engineer

Yet-to-join.png

Jeel Patel
Engineer

Yet-to-join.png

Jaikumar Bhandari
Junior Engineer

Yet-to-join.png

Tapan Kapdi
Supervisor

Yet-to-join.png

Sandip Dhoranwala
Senior Engineer

Yet-to-join.png

Divyeshbhai Dhodi
Fitter

Yet-to-join.png

Ashishkumar Bhandari
Fitter

2.png

A-League of Our Own

Asset 49.png
01.png
02.png
04.png
03.png

Mechanical

Chandrasing
Muslim Khan
Manover
Ramesh
Tribhuvan
Yash Sharma

Electrical

Hemraj
Bharat
Dipesh
Santosh
Jeel Patel

Automation

Anup 
Jignesh
Amit

DIE

Imran
Nayan
Hera
Dharma Machi

2.png

Principles we stand by

3.png

Challenge

Don’t accept waste, encourage innovative ideas, remove the “if it’s not broken don’t fix it” mentality, reduce the fear of asking dumb questions.

​Go and See

If there is an issue YOU go and look at it, don’t just talk about it. Assess what you see and review areas of concern with your team.

Continuous improvement

(Kaizen) Encouraging simple cheap improvements, rewarding individuals who develop continuous improvement ideas.

Respect

Each individual has a role to play, respect it. Remove the emotion by using the facts. Use a situational leadership approach.

Teamwork

Understand individual’s strengths and weaknesses, train your team, work together on projects, and create Pride in the team.

2.png

What we do?
Our Responsibilities

Asset 56.png

Plan

Continuously seek out issues and processes that need improvement. Plan and define activities and expected improvement outcomes.

Asset 57.png

Execute

Put the plan into effect such as changes to production processes, maintenance strategies, implementing training or changing work practices.

Asset 58.png

Examine

Inspect the accuracy of the plan to avoid wastage of efforts.

Asset 59.png

Take Action

After reviewing the data in the “Examine” process, according to the situation:
1. We create standards so that similar issues don’t arise in future
2. We modify the plan to improve the outcome. (Go back to the “Plan” stage.)
3. Look to improve the outcomes further through standards set and strive for what’s next.

Asset 51.png

“80% of plant downtime applies to 20% of the installed equipment”

The significance of the 80/20 rule is that if the top 20% of losses can be identified and then eliminated improvements will be made in the shortest timeframe.

Our 80/20 Rule

Asset 52.png
2.png

Get into Gear –
Types of
Maintenance works

Breakdown Maintenance

Preventive Maintenance

Routine maintenance

Predictive Maintenance

Corrective Maintenance

Condition Based Maintenance

Zero Maintenance

Total Productive Maintenance

Asset 53.png
Asset 54.png

You will be guided with further documentation details by your reporting manager, if you have any queries feel free to connect at

As you are at the end of your detailed department training induction, we would love to hear your feedback on the same. Request you to download and fill up the feedback form and submit it to us for an internal review.

bottom of page