Quality, Lab Test & Design

We are the masters of check recheck and check again. We are obsessed with checking compulsions based on standard parameters. We love to work on layers but are grumpy about taking up changes in layers. The variety in our work starts with Final.dwg to NewFinal.dwg to NewerFinal.dwg to NewestFinal.dwg going up to NewestFinalJanuray.dwg and so on.

​

Yes! we are a team of Quality, Testing & Designing.

2.png

Meet the Maestros

Asset 64.png

Soumendra Kumar Rout
Vice President - Operations

To understand more about Quality, Lab testing and Design,
click on the appropriate department and read further.

Dipak-Gosavi.png

Dipak Gosavi
Senior Engineer - Quality & Technical Support

Yet-to-join.png

Sadabali Kalia
Engineer - Quality

Yet-to-join.png

Rishu Kumar
Engineer - Quality

Yet-to-join.png

Chirag Bhandari
Engineer - Quality

Asset 62.png

Kanhu Charan Pradhan
Assistant Manager - Research, Development & Testing Lab

Yet-to-join.png

Raju Mistry
Manager - Design & Development

Asset 65.png

Sunil Parajapati
Senior Engineer -
Design & Development

Asset 61.png

Divyesh Machhi
Senior Executive -
Design &
Development

Yet-to-join.png

Nimish Machhi
Senior Executive -Design & Development

QC
Lab Testing.png

Quality

Further in this induction, you will read through the two aspects of quality management - quality control which involves inspection stages and processes, and quality assurance - which ensures the product production processes are in line with the requirement.

2.png

Area of focus

QUALITY DEPARTMENT

Continual improvement in QC process by implementation of SOPs for almost every possible inspection category.

​

Capturing valuable measurements and communicating them to the concerned stakeholders.

​

Successful implementation and continual improvements for

the ISO systems.

​

Calibrating all measuring equipment and inspecting the products to be done with product specifications and drawings.

​

Developing gauges and other mechanisms for the inspection.

​

Maintain all the documentation in sever for smooth traceability.

Asset 9.png

Quality Inspection Process

Click on every process to know more in detail

Raw materials

Product accessories 

Press shop

Pre Treatment

Finish Goods

Mock up

Powder Coating

Cement Filling

Lamination

incoming inspection

Incoming inspection

Incoming inspection is generally called as
Raw Material Inspection received against purchase

Raw materials

CRCA Steel

Laminate/PVC

Beeding

  Cement/fly ash

Product accessories 

Pedestal

Stringers

Screws

 Pedestal Cap

 NGF Accessories

In process Inspection

Press shop

Length

Width

Height

Pre Treatment

Patches

Oil on surface

Visual inspection

Thickness

Powder Coating

DFT

Scratch test

Impact test

Acetone test

Cement Filling

Density

Panels Filling

Cleanliness

Visual inspection

Lamination

Beeding

Laminate/PVC

Glue

Visual inspection

Flatness

Visual inspection

Visual inspection

In-process quality inspection is checking the process parameters whether they are
within the limit as specified in the process specification.

in process inspecton
final inspection

Batch printing /Panel identification

Fitment  of cement filling hole caps or Stickers

Cracks on cone /Edge / Corner (Specify Numbers observed)

Cleanliness and Finishing of Panels

Pallet Condition

Corner support and angle board for final palletized materials

Finished product packing ( Palletizing, strapping, wrapping)

Any other defects observation

Detailed tasks and responsibilities related all five area of focus is attached in the document.

Lab testing
vlcsnap-2022-05-31-15h43m03s149.png

Lab testing

Further in this induction guide, we introduce you to the most authoritative industry production standard and  specification of UNITILE Raised Access floor - CISCA ,BS EN 12825: 2001 (E ) & PSA MOB PF2 PS Recommended test procedures for access floors, to help you pick up the best access floor manufacturer. 

2.png

Area of focus

LAB TESTING DEPARTMENT

Marinating all the testing machines and equipment for workability.

​

Ensuring all testing machines are up to date w.r.t. load cells and calibration.

​

Providing total support to the design or development team for the design validation if required any testing works.

​

Ensuring that the experience center is updated with the current and almost all products range.

​

Providing support to the sales team for any client visits to the factory by demonstrating the products and performing the tests.

​

Maintain all the documentation in sever for smooth traceability.

Asset 9.png
2.png

Acceptance criteria

When accepting UNITILE raised access floor, whether it is on the floor surface or on the top of the head, it must be kept clean, and at the same time check the surface of the raised floor for obvious damage such as scratches and cracks.

1.

In addition, there are strict requirements for the robustness of raised floors. You can try walking on it first, check if it has a strong shake and if it will make a sound. 

2.

When accepting, please pay attention to whether the edge strips of the floor are on the same line. The misalignment between two adjacent floors should be controlled within 1 mm and the height difference should be less than 1 mm.

3.

Further introduction on all equipment in our world class testing lab, authoritative certification and testing for access flooring system is explained in the Lab testing guide

2.png

Department Rules

It is essential for any person whether internal or external to the organization to take permission from the lab in charge before accessing the lab.
 

If you are new to the lab then one lab expert or any person assigned by the lab in charge must assist you.
 

The lab rules and/or lab in-charge will review specific safety issues on individual experiments before you perform any tests.
 

Before operating any machine/equipment or before doing any kind of tests/operation in the lab it is essential and mandatory to read the standard operating procedure (SOP).
 

The SOPs are available with the lab in-charge and can also be accessed with the respective machine or equipment.
 

Wear all the necessary safety equipment before testing. In case the necessary and advised safety equipment is not used then the user will be responsible for any kind of accident or loss to self.
 

Do not touch any moving parts or control panels when the machine is in running condition.
 

If any measuring equipment or any other material is accessed and taken from the lab for the operations of any kind of measurements then the same shall be placed back to its position.
 

Do not take away any measurement tools and equipment from the testing lab without permission or unless authorized to do so.
 

Immediately report any spills, equipment malfunctions, injuries, or other perceived safety hazards to your Instructor or staff member, or lab in-charge or admin(in case no one is there in the lab).
 

Maintain self distance from the equipment and machine while taking video and photos.
 

At the time of testing and using equipment mobile phones should be on silent mode.

Read and fully comprehend the ‘TESTING LAB RULES AND REGULATIONS’ as set forth in the lab before you begin any experiment or operation. If you do not understand the rules or procedure contact the lab in charge.

Product Design
IMG_7917.JPG

Design

Further in this induction, you will read through the process of imagining, creating, and iterating products that solve users’ problems or address specific needs in our industry.

2.png

Area of focus

DESIGN DEPARTMENT

Each new design approach shall be followed by need analysis, conceptualization, and proposal in the sequence.

​

Focused approach on the design verification and validation.

 

Making cost-effective designs along with the expected requirements.

 

Provide continual support to the inter-department teams for any types of design works/assignments either for the new developments or for the modification/alteration/drawing works/assignments.

 

Maintain all the documentation in sever for smooth traceability.

Asset 9.png
2.png

Department Rules

Invest time in the design process. The most effective workspaces don't begin with great furniture, they begin with great design.
 

Involve staff and new ideas.
 

Create balance in design and thought process. 
 

Design for service, maintenance, and reparability.
 

Follow the process of Design- Input, Output, Review, Verification, and Validation of Records as per IMS.

Here’s a quick video link and product catalog to understand the concept and advantages of raised access floor systems within the different applications.

Asset 60.png

You will be guided with further documentation details by your reporting manager, if you have any queries feel free to connect at

As you are at the end of your detailed department training induction, we would love to hear your feedback on the same. Request you to download and fill up the feedback form and submit it to us for an internal review.